GO TO 
FOLLOW US
  • Facebook Social Icon
  • Twitter Social Icon

Disaster Preparedness and Medication Administration

October 24, 2017

Prepping for Power Failure

 

In 2012, Tropical Storm Sandy created a widespread outage covering Lower Manhattan and leaving over 250,000 people without power1. During the outage, two high volume Manhattan hospitals, NYU Langone Medical Center and Bellevue Hospital, experienced back-up generator failures that forced the evacuation of nearly 1,000 patients2. Nearly five years later, Houston’s Ben Taub Hospital3 and Florida Hospital at Connerton in Pasco County, FL4 experienced similar generator failures after hurricanes Harvey and Irma..

 

 

 

 

 

 

 

 

 

 

View Full Paper to Learn More

 

Please reload

About Us

Shift Labs creates well-designed devices for fast-growing healthcare sectors, everywhere from home health care in the US to clinical care in emerging markets. We emphasize both design and technology to create devices that help a diverse range of healthcare workers to provide better care in more places.

  • Facebook Social Icon
  • LinkedIn Social Icon
  • Twitter Social Icon
PHYSICAL ADDRESS

Shift Labs, Inc.

9200 Holman rd NW

Seattle, WA 98117 USA

Email: info@shiftlabs.com
Tel:  +1 206.369.1216

STAY UP TO DATE WITH OUR NEWSLETTERS